Drive 6‑Ton Excavators and Skid Steer Loaders in a 70‑Minute Small‑Group Heavy‑Equipment Session

LAS VEGAS EVENTS FIELD GUIDE

Drive 6‑Ton Excavators and Skid Steer Loaders in a 70‑Minute Small‑Group Heavy‑Equipment Session

A hands‑on, 70‑minute Dig This session for groups of 4–8 that includes a safety class, machine operation, team challenges and a graduation.

Drive 6‑Ton Excavators and Skid Steer Loaders in a 70‑Minute Small‑Group Heavy‑Equipment Session.

Duration
70 Minutes
Location
Las Vegas
Operator
Dig This
Category
Events
Robert Eric Crews
Founder & Editor, The Adventure Collective
Published Verified

Experience the raw, mechanical thrill of heavy earthmoving in a focused 70‑minute session built for groups of 4–8. At Dig This you’ll receive a safety class then take the controls of powerful 6‑ton excavators and skid steer loaders to dig trenches, move 1,000‑lb tires, backfill, and build—and knock down—tire pyramids.

Highlights

Outing Highlights

THE MACHINES

Six‑Ton Excavators and Skid Steer Loaders

The session puts participants behind the controls of heavy equipment: two 6‑ton excavators and two skid steer track loaders are on site for hands‑on operation and team exercises.

THE CHALLENGE

Dig Trenches, Move 1,000‑lb Tires, Build Pyramids

Expect a sequence of active tasks—warm‑ups, digging deep trenches, hauling and stacking massive tires, backfilling, and building and knocking down tire pyramids—designed for teamwork and fast payoff.

THE FORMAT

A Focused 70‑Minute Group Session with Safety Class

This easy‑to‑plan group event begins with a safety class, moves into supervised machine operation and concludes with a graduation—making it a compact, memorable outing for small teams.

What the day feels like

What the Session Feels Like

The session opens with a safety briefing and warm‑up exercises, then staggers the group through supervised time in the excavators and skid steers. Activities are task‑driven—digging and backfilling trenches, relocating 1,000‑lb tires, and assembling tire pyramids—so the 70 minutes are dense with hands‑on operation and visible, group‑based progress.

Suitability

Who it's for

Who this session suits—and who should rethink it.

1
Small GroupsDesigned specifically for groups of 4–8, this session is ideal for small teams who want a compact, hands‑on shared experience.
2
Families with Older KidsFamilies with children aged 8 and up can enjoy supervised machine operation and teamwork tasks together.
3
Corporate Teams & CelebrationsThe easy‑to‑plan format and clear, time‑boxed activities make this a straightforward option for team building or a celebratory outing.
4
Children Under 8Not appropriate—participants must be at least 8 years old to take part in machine operation.

Practical planner

Details to review before reserving

Timing & Season

Session length: 70 minutes.

What to Expect on Site

On‑site equipment includes two 6‑ton excavators and two skid steer track loaders available for participant operation under supervision.

Logistics

Meet at Dig This for check‑in and the safety class; sessions are designed for groups of 4–8 and include supervised operation and graduation.

Booking Notice

Review cancellation policies before reserving.

Frequently asked questions

Planning Your Outing

How long is the session?

The session runs for 70 minutes.

What ages can participate?

Participants must be at least 8 years old.

How many people are in a group?

Sessions are designed for groups of 4–8 people.

What equipment will I operate?

You will operate 6‑ton excavators and skid steer track loaders (two of each on site).

What activities are included?

The session includes a safety class, warm‑up exercises, digging and backfilling trenches, moving 1,000‑lb tires, and building and knocking down tire pyramids, followed by a graduation.